O Desafio
An electric vehicle component supplier needed a custom bracket assembly to house liquid cooling pipes within a battery pack. The project required high structural integrity to withstand vibration and strict adherence to thermal management specifications. The volume required was high (10,000+ units), but the lead time was compressed due to a supply chain disruption elsewhere.
A Solução Xingineer
Processo: Sheet Metal Fabrication (Laser Cutting, Bending) & Welding.
Execução: Leveraging our extensive partner network across China, we scaled up production immediately. We used high-speed laser cutting for precision and robotic welding to ensure consistent joint strength across all units.
Value-Added: We performed a full assembly fit-check verification before shipping.
Resultado: By coordinating between our internal team and partners, we delivered the first batch of 2,000 units within two weeks, preventing a production line stoppage for the client.




